UNSW developed a 2025 Strategy which guides the actions and decision-making to create accessible and environmentally sustainable campuses in line with the UN Sustainable Development Goals.
To support the Strategy, UNSW has also developed a 20-year Masterplan and Environmental Sustainability Plan (ESP) 2019-21, which outline the path to best practice in environmental sustainability supported by a holistic vision for outstanding campuses. Even with these key documents in place, UNSW still needed a way to provide guidance to project teams and suppliers across a range of project types, which would ensure consistency across the portfolio, while still allowing the flexibility for each team to respond appropriately based on its specific project requirements and opportunities.
What we did
HKA was engaged to create and deliver the Capital Works Sustainability Framework. Intended to provide alignment between the UNSW and Estate Management vision and mission statements, the 2025 Strategy and the ESP 2019-21, the Framework articulates the role and potential of the built environment in delivering ‘the vision of becoming Australia’s global university, improving and transforming lives through excellence in research, outstanding education and a commitment to advancing a just society’.
Outcomes
We developed the Capital Works Sustainability Framework for UNSW. It provides guidance on an approach for project teams to take in the design and delivery of fitouts, refurbishments, new buildings and infrastructure, in a way that is specific to UNSW, and is an expression of the unique character and history of its campuses.
Supporting this Framework is a suite of templates for use in preparing briefs and contracts and reporting on project progress with regard to sustainable and regenerative design outcomes. It has also informed UNSW’s Design and Construction Standards, ensuring that the detail of the implementation is powerfully connected to and a direct expression of the UNSW vision.
The Capital Projects Sustainability Framework:
- Provides clarity around expectations and outcomes, setting out the process and structure to deliver success for various project types, and for the campus system as a whole
- Was developed in a way which allows for flexibility to choose what is appropriate in different settings, and for each project type
- Addresses emergent trends and standards in the sustainable built environment sector, including restorative and regenerative practice, and the increased focus on wellbeing
- Integrates with UNSW’s project processes and other requirements
- Establishes the technical requirements for sustainability for UNSW capital projects.
-
ClientUniversity of New South Wales
-
Year2019
-
ServicesAdvisory
-
SectorsConstruction and Engineering, Buildings
RELATED PROJECTS
RELATED PROJECTS
Subsea Interconnector Cable Failure
Europe
Independent Commercial, Cost & Risk Review of Road Development
Europe
Independent Quantum Expert Review of Maintenance Contract
Europe
Major Light Rail Transit
Americas
Two New Venues
Middle East
A Major Teaching & Research Hospital
Europe
Nuclear Power Plant
Americas
New School Campus, Ultimo Primary School
Oceania
Sydney Water, Partnering for Success (P4S)
Oceania
Melbourne Airport Rail
Oceania
Liquefied Natural Gas (LNG) Project Australia
Oceania
Residential Development
Middle East
Natural Gas-Fired Power Plant
Asia
Industrial Manufacturing Facility
Europe
Subsea Power Cable Failure
Asia
Subsea Cable Installation & Trenching Operations
Asia
Independent Quantum Expert Opinion of Highway Maintenance Contract
Europe
Energy and Telecom Cable Manufacturer
Americas & Asia
Franchise Fraudulent Transfer Matter
Americas
Clean Fuels Project
Middle East
Nuclear Power Plant Decommissioning
Americas
Global chemicals manufacturer
Americas & Europe
Home security company sale agreement
Americas
Business Park, Surrey
Europe
Highway Rock Cuttings
Middle East
Coal-fired power plant
Asia
Coal-fired power plant
Americas
Water desalination plant
Americas
Offshore refinery contractor performance review
Asia
WestConnex Rozelle Interchange
Oceania
Public transport service improvement
Oceania
Major Canadian Utility Commercial Damages Matter
Americas
Major Nuclear Power Plant
Americas
South American Oil Refinery
Americas
Power Plant
Americas
University of North Carolina Hospitals
Americas
Longview Power Plant
Americas
Spent Nuclear Fuel Verdicts & Settlements
Americas
Missouri Power Plant
Americas
Share our Space Program
Oceania
Lower South Creek Treatment Program
Oceania
Allseas & Pioneering Spirit
Europe
Hume Community Housing
Oceania
Infrastructure Investment Assurance Framework
Oceania
Electricity Network Improvement
Oceania
Major Transport Projects Review
Oceania
High Speed 2 (HS2) Project
Europe
Urban Transformation & Transport Programme
Oceania
Strategic Procurement & Programme Management Improvement
Oceania
Business Reform & Procurement Strategy
Australia
Sydney Metro
Oceania
Temporary School at Ultimo Primary School
Oceania
Gerald Desmond Bridge
Americas
Office and Retail Landmark
Americas
Port of Long Beach
Americas
Airport Pavement Management Survey
Americas
Greenfield St George Airport, Utah
Americas
A Giant Oilfield
Asia
Hunter River Remediation
New South Wales, Australia
Great Western Highway Widening
Victoria, Australia
Rail Rehabilitation Scheme
Bucharest to Brasov line, Romania
Yanbu Power & Desalination Plant
Yanbu Industrial City, Saudi Arabia
Follow HKA on WeChat
关注我们的官方微信公众号