Recovering the commercial damages incurred during the construction of a US$723 million high-voltage power line.
A new 500-kilovolt transmission line was built to deliver reliable power to major populations centers in a Canadian province. It carries electricity from transmission points along two rivers to more than 3.2 million people.
A utility corporation owned by the government and citizens of the province was awarded the design-build contract in 2011. Construction got underway on the largest expansion in three decades of the state’s transmission system the following year.
The transmission line was completed almost a year late in 2015, following delays caused by a range of factors including scope changes, design and construction challenges, and conditions along the line’s route. The new line was built through some of Canada’s most challenging and diverse terrain, crossing mountains, major rivers, grasslands and highways. It also traverses public and private lands.
Brief
The main contractor retained HKA to provide delay and disruption analysis and forensic accounting analysis associated with a US$310 million claim on the project.
What we did
We assembled an expert team comprising specialists in the following areas:
- Schedule analysis and support
- Forensic delay analysis
- Disruption / loss of productivity quantum analysis
- Forensic accounting
We also provided expert witness testimony during arbitration, along with services for the arbitration hearing and post-brief support.
Outcomes
Our comprehensive and detailed analysis provided the basis for our client’s successful claim and the recovery of the majority of its incurred costs.
The arbitrator – in a decision released in March 2018 – found that changes made by the utility corporation to a portion of the line had delayed the contractor’s work. Also, access problems involving private land and archaeological sites disrupted its construction schedule, causing a loss of productivity and additional costs for which the utility was responsible under the contract.
Interest was also payable on some of these award amounts, taking the total recovered in commercial damages to approximately US$135 million.

"Our comprehensive and detailed analysis provided the basis for our client’s successful claim and the recovery of the majority of its incurred costs."
Paul Pocalyko, Partner, Joint Construction, Claims and Expert Services Lead, US, HKA
-
ClientConfidential
-
ValueUS$723 million
-
ServicesCommercial Damages and Valuation, Delay and Disruption Analysis
-
SectorsConstruction and Engineering, Power and Utilities
RELATED PROJECTS
RELATED PROJECTS

Subsea Interconnector Cable Failure
Europe

Independent Quantum Expert Review of Maintenance Contract
Europe

Major Light Rail Transit
Americas

Two New Venues
Middle East

A Major Teaching & Research Hospital
Europe

Nuclear Power Plant
Americas

New School Campus, Ultimo Primary School
Oceania

UNSW Capital Projects Sustainability Framework
Oceania

Sydney Water, Partnering for Success (P4S)
Oceania

Melbourne Airport Rail
Oceania

Liquefied Natural Gas (LNG) Project Australia
Oceania

Residential Development
Middle East

Natural Gas-Fired Power Plant
Asia

Industrial Manufacturing Facility
Europe

Subsea Power Cable Failure
Asia

Subsea Cable Installation & Trenching Operations
Asia

Independent Commercial, Cost & Risk Review of Road Development
Europe

Energy and Telecom Cable Manufacturer
Americas & Asia

Franchise Fraudulent Transfer Matter
Americas

Clean Fuels Project
Middle East

Nuclear Power Plant Decommissioning
Americas

Global chemicals manufacturer
Americas & Europe

Home security company sale agreement
Americas

Business Park, Surrey
Europe

Highway Rock Cuttings
Middle East

Coal-fired power plant
Asia

Coal-fired power plant
Americas

Water desalination plant
Americas

Offshore refinery contractor performance review
Asia

WestConnex Rozelle Interchange
Oceania

Public transport service improvement
Oceania

Independent Quantum Expert Opinion of Highway Maintenance Contract
Europe

Major Nuclear Power Plant
Americas

South American Oil Refinery
Americas

Power Plant
Americas

University of North Carolina Hospitals
Americas

Longview Power Plant
Americas

Spent Nuclear Fuel Verdicts & Settlements
Americas

Missouri Power Plant
Americas

Share our Space Program
Oceania

Lower South Creek Treatment Program
Oceania

Allseas & Pioneering Spirit
Europe

Hume Community Housing
Oceania

Infrastructure Investment Assurance Framework
Oceania

Electricity Network Improvement
Oceania

Major Transport Projects Review
Oceania

High Speed 2 (HS2) Project
Europe

Urban Transformation & Transport Programme
Oceania

Strategic Procurement & Programme Management Improvement
Oceania

Business Reform & Procurement Strategy
Australia

Sydney Metro
Oceania

Temporary School at Ultimo Primary School
Oceania

Gerald Desmond Bridge
Americas

Office and Retail Landmark
Americas

Port of Long Beach
Americas

Airport Pavement Management Survey
Americas

Greenfield St George Airport, Utah
Americas

A Giant Oilfield
Asia

Hunter River Remediation
New South Wales, Australia

Great Western Highway Widening
Victoria, Australia

Rail Rehabilitation Scheme
Bucharest to Brasov line, Romania

Yanbu Power & Desalination Plant
Yanbu Industrial City, Saudi Arabia
Follow HKA on WeChat
关注我们的官方微信公众号