Responsible for teaching and learning from early childhood to third level, the New South Wales Department of Education is Australia’s biggest organisation, and one of the largest education authorities in the world, with an annual budget of more than US$12.6 billion.
Facing dramatic growth in the school–age population, the state is investing US$4.5 billion in 170 new and upgraded schools over the four years from 2018-19.
The US$38.5 million project for a new primary school for Ultimo, one of the Sydney metropolitan area’s densest suburbs, is in the vanguard of a new approach to school development. It will provide a high-quality, innovative learning environment for 800 students from kindergarten through sixth grade. The project also involved creating a temporary school for 300 children, and intensive community engagement.
Brief
For this high-profile, state-of-the-art project, HKA’s role included full project management services through all project phases, as well as community consultation.
HKA was retained to manage the school construction project, including stakeholder engagement, as part of the department’s ‘design excellence’ program. Following the discovery of severe ground contamination at the proposed development site, our role widened to cover alternative solutions.
What we did
As analysis of geotechnical sampling confirmed the high cost of remediation, we advised against purchase of the brownfield site and the Department changed their strategy to a redevelopment of the existing site.
We were commissioned to investigate other locations for a temporary school site while this redevelopment was completed.
Aware that positive stakeholder engagement was critical, our team maintained our close consultation with local community representatives, many of whom strongly favoured the original site. The existing steeply sloping site has roads on three sides and a neighbouring apartment complex on the fourth. The new building includes 30 classrooms, indoor and outdoor play spaces, after school facilities, space for a future early learning centre, staff rooms and school administration area. The building was completed in March 2020.
This involved:
- Design Competition to engage HDC for main works
- Selection of an alternate site for a temporary school (‘pop-up’) for provision of school services while the existing school was demolished, and the new school built
- Design, approval and construction of the ‘pop-up’ school
- Design team to deliver a fully-documented design for the new school
- Relocation of the school from the existing facility to the ‘pop-up’
- Procurement of contractors for the demolition of the existing building and construction of the new
- Demolition of the existing building
- Construction of a new school which would accommodate up to 800 students in grades K-6
- Relocation of the school from the pop-up to the new facility.
Outcomes
The logistical outcomes against the objectives were:
- To provide world-class teaching spaces and facilities consistent with the school facilities standards, open for teaching in early 2020 – the school was operational from mid-March 2020, despite significant construction delays due to in-ground conditions, inclement weather, and industrial action.
- To provide a preschool space for a future childcare – the building includes a cold shell for a preschool, which is currently being designed and planned for taking students at the start of 2021.
- Enhanced processes for SINSW – Our processes have informed SINSW’s standards regarding community consultation practices, which now include a ‘welcome event’ at the opening of a new school and project-specific webpages on their website.
The stakeholder outcomes against the main objective were:
- To provide ‘an awesome place to learn’ for the students – The principal has provided feedback on numerous occasions that the students are extremely happy in the new school. Following a short period at school prior to the Easter break, he reported that ‘he had never heard such screams of delight’ when the students arrived again after their holidays.
- To provide a building which enables future-focused learning: The building offers numerous permutations for classes to be combined, as well as indoor/outdoor learning through extensive sliding doors. It also incorporates a substantial upgrade in IT infrastructure.
- To place the school at the heart of the community – Ultimo Public School has an extensive roster of community activities out of hours, including a Japanese school, various sporting activities, and OSHC, maintaining its role as a community hub, with room to grow.
"This project has been a great demonstration of our belief that delivering stakeholder management as part of our project management scope enables us to meaningfully connect with all key stakeholders, aligning around shared values for outcomes that served the whole community. Working with SINSW and its stakeholders, we have delivered a school which is reflective of the character and identity of Ultimo."
-
ClientNSW Department of Education
-
Year2020
-
ValueUS$38.5 million
-
ServicesAdvisory
-
SectorsConstruction and Engineering, Buildings
RELATED PROJECTS
RELATED PROJECTS
Subsea Interconnector Cable Failure
Europe
Independent Commercial, Cost & Risk Review of Road Development
Europe
Independent Quantum Expert Review of Maintenance Contract
Europe
Major Light Rail Transit
Americas
Two New Venues
Middle East
A Major Teaching & Research Hospital
Europe
Nuclear Power Plant
Americas
UNSW Capital Projects Sustainability Framework
Oceania
Sydney Water, Partnering for Success (P4S)
Oceania
Melbourne Airport Rail
Oceania
Liquefied Natural Gas (LNG) Project Australia
Oceania
Residential Development
Middle East
Natural Gas-Fired Power Plant
Asia
Industrial Manufacturing Facility
Europe
Subsea Power Cable Failure
Asia
Subsea Cable Installation & Trenching Operations
Asia
Independent Quantum Expert Opinion of Highway Maintenance Contract
Europe
Energy and Telecom Cable Manufacturer
Americas & Asia
Franchise Fraudulent Transfer Matter
Americas
Clean Fuels Project
Middle East
Nuclear Power Plant Decommissioning
Americas
Global chemicals manufacturer
Americas & Europe
Home security company sale agreement
Americas
Business Park, Surrey
Europe
Highway Rock Cuttings
Middle East
Coal-fired power plant
Asia
Coal-fired power plant
Americas
Water desalination plant
Americas
Offshore refinery contractor performance review
Asia
WestConnex Rozelle Interchange
Oceania
Public transport service improvement
Oceania
Major Canadian Utility Commercial Damages Matter
Americas
Major Nuclear Power Plant
Americas
South American Oil Refinery
Americas
Power Plant
Americas
University of North Carolina Hospitals
Americas
Longview Power Plant
Americas
Spent Nuclear Fuel Verdicts & Settlements
Americas
Missouri Power Plant
Americas
Share our Space Program
Oceania
Lower South Creek Treatment Program
Oceania
Allseas & Pioneering Spirit
Europe
Hume Community Housing
Oceania
Infrastructure Investment Assurance Framework
Oceania
Electricity Network Improvement
Oceania
Major Transport Projects Review
Oceania
High Speed 2 (HS2) Project
Europe
Urban Transformation & Transport Programme
Oceania
Strategic Procurement & Programme Management Improvement
Oceania
Business Reform & Procurement Strategy
Australia
Sydney Metro
Oceania
Temporary School at Ultimo Primary School
Oceania
Gerald Desmond Bridge
Americas
Office and Retail Landmark
Americas
Port of Long Beach
Americas
Airport Pavement Management Survey
Americas
Greenfield St George Airport, Utah
Americas
A Giant Oilfield
Asia
Hunter River Remediation
New South Wales, Australia
Great Western Highway Widening
Victoria, Australia
Rail Rehabilitation Scheme
Bucharest to Brasov line, Romania
Yanbu Power & Desalination Plant
Yanbu Industrial City, Saudi Arabia
Follow HKA on WeChat
关注我们的官方微信公众号