Managing the transformation of an industrial plant into a new office and retail landmark
2400 Market Street in Philadelphia, Pennsylvania’s largest city, is a landmark building undergoing renovation and major expansion. Originally built as a Hudson Motor Car plant in the 1920s, the building is being transformed to provide 600,000 square feet of space for offices, retail and a hotel.
This USD$150 million construction project signifies the westward shift of the Center City to the growing University City district of Philadelphia.
Developer PMC Property Group is constructing a five-floor steel superstructure – above the old concrete building – that will house the new global headquarters of Aramark. The 1,200 employees of the food and facilities management giant are currently split between two office blocks elsewhere in the city. The extensively renovated four floors beneath will be leased to other tenants.
Occupying an entire city block alongside the Schuylkill River, the modern glass and steel development has been designed by architects Gensler and Varenhorst to high sustainability standards under the LEED (Leadership in Energy and Environmental Design) certification system.
The completed building will feature abundant green space on outdoor terraces, highly efficient variable-refrigerant flow heating and ventilation systems, a floor-to-ceiling waterfront glass-line, and a promenade link to a popular riverside walking and biking trail.
Brief
The Property Owner, which is both developer and main contractor for this challenging project, retained HKA to supplement its construction team. Our role was to oversee construction, liaise with all parties and ensure the project runs to schedule and budget.
What we did
The high-profile project has posed technical challenges – not least cutting an elevator shaft and stairwell through the heavily reinforced concrete floors – as well as scheduling complexities.
A construction management specialist and scheduling expert make up the HKA team.
Our first priority was to finalise the project manual, comprising all plans and specifications for the building works, so Aramark could commission the design for its office fit-out.
We developed and maintain the critical path method (CPM) schedule and devised the reporting mechanisms to the client and Aramark. This includes monthly updates on progress towards milestones set for individual floors. As each floor completes, it is then handed over to fit-out.
HKA’s role also involves:
- Acting as a liaison between the developer, Aramark and its representatives, and subcontractors.
- Overseeing and reviewing construction documents and project correspondence.
- Attending weekly progress meetings, design status sessions and site tours.
- Anticipating and resolving technical and other problems that could lead to disputes between the parties.
- Making recommendations to the client to keep the project running smoothly.
Outcomes
All milestones were achieved on time or in advance.
The HKA team helped nurture a culture of mutual trust through open and honest communications with all parties.
-
ClientConfidential
-
Year2018
-
ValueUSD$150 million
-
ServicesClaims, Claims & Dispute Resolution, Advisory
-
SectorsConstruction and Engineering, Buildings
RELATED PROJECTS
RELATED PROJECTS
Subsea Interconnector Cable Failure
Europe
Independent Quantum Expert Review of Maintenance Contract
Europe
Major Light Rail Transit
Americas
Two New Venues
Middle East
A Major Teaching & Research Hospital
Europe
Nuclear Power Plant
Americas
New School Campus, Ultimo Primary School
Oceania
UNSW Capital Projects Sustainability Framework
Oceania
Sydney Water, Partnering for Success (P4S)
Oceania
Melbourne Airport Rail
Oceania
Liquefied Natural Gas (LNG) Project Australia
Oceania
Residential Development
Middle East
Natural Gas-Fired Power Plant
Asia
Industrial Manufacturing Facility
Europe
Subsea Power Cable Failure
Asia
Subsea Cable Installation & Trenching Operations
Asia
Independent Commercial, Cost & Risk Review of Road Development
Europe
Energy and Telecom Cable Manufacturer
Americas & Asia
Franchise Fraudulent Transfer Matter
Americas
Clean Fuels Project
Middle East
Nuclear Power Plant Decommissioning
Americas
Global chemicals manufacturer
Americas & Europe
Home security company sale agreement
Americas
Business Park, Surrey
Europe
Highway Rock Cuttings
Middle East
Coal-fired power plant
Asia
Coal-fired power plant
Americas
Water desalination plant
Americas
Offshore refinery contractor performance review
Asia
WestConnex Rozelle Interchange
Oceania
Public transport service improvement
Oceania
Independent Quantum Expert Opinion of Highway Maintenance Contract
Europe
Major Canadian Utility Commercial Damages Matter
Americas
Major Nuclear Power Plant
Americas
South American Oil Refinery
Americas
Power Plant
Americas
University of North Carolina Hospitals
Americas
Longview Power Plant
Americas
Spent Nuclear Fuel Verdicts & Settlements
Americas
Missouri Power Plant
Americas
Share our Space Program
Oceania
Lower South Creek Treatment Program
Oceania
Allseas & Pioneering Spirit
Europe
Hume Community Housing
Oceania
Infrastructure Investment Assurance Framework
Oceania
Electricity Network Improvement
Oceania
Major Transport Projects Review
Oceania
High Speed 2 (HS2) Project
Europe
Urban Transformation & Transport Programme
Oceania
Strategic Procurement & Programme Management Improvement
Oceania
Business Reform & Procurement Strategy
Australia
Sydney Metro
Oceania
Temporary School at Ultimo Primary School
Oceania
Gerald Desmond Bridge
Americas
Port of Long Beach
Americas
Airport Pavement Management Survey
Americas
Greenfield St George Airport, Utah
Americas
A Giant Oilfield
Asia
Hunter River Remediation
New South Wales, Australia
Great Western Highway Widening
Victoria, Australia
Rail Rehabilitation Scheme
Bucharest to Brasov line, Romania
Yanbu Power & Desalination Plant
Yanbu Industrial City, Saudi Arabia
Follow HKA on WeChat
关注我们的官方微信公众号